Timothy Cabin

Under Construction

Formally two buildings known as Timothy and Sioux, our newest building will be known as First and Second Timothy.  The top floor will feature 3 bedrooms, a full bathroom, a full kitchen, and a living room area.  The lower level will also include 3 bedrooms, a kitchenette, a full bathroom, and a living room area.  The entire building will be air conditioned in the summer and heated in the winter making it useable all 12 months.  

We are currently hopeful construction will be completed in mid to late summer of 2024.

Additional details and photos will be added when they become available.

 